Free Shipping on All Orders!Get 50$ off your first order of 600$ or more as a new user!
USD
  • USD - US Dollar
  • EUR - Euro
  • AED - Arab Emir. Dirham
  • BRL - Brazilian Real
  • CAD - Canadian Dollar
  • RUB - Russian Ruble
  • SAR - Saudi Arabia Riyals
Your Cart
Added to Cart

Factory Information

Factory Visual Gallery
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
Guangzhou Yiqin Technology Co., Ltd.
× Factory large view
Factory Information
Production Line
SADELOOS Manufacturing · Guangzhou Yiqin Technology
Manufacturing process

Built by process. Proven by inspection.

Every cover moves through one controlled line — cut, formed, bonded, marked, checked and packed. The standard is the same at every station: hold the reference, protect the surface and verify before release.

In-house CNC cutting, forming and coating
In-line Fit, bond and seal checks
Quality system International quality management system
Verified Final pack release
CNC cutting and milling of truck bed cover panels Station 01
CNC cutting & milling · in-line
FocusEdge & fit
ReleaseDimensional check

Line noteThe edge is checked before the panel is allowed to move.

01Precision

CNC Cutting & Milling

Panels and structural parts are cut and milled against the fitment reference — not a generic profile. Clean edges and repeatable geometry keep every mounting point where the truck expects it.

Control points

  1. 01
    Reference location

    Critical cutouts and mounting points checked against the fitment reference.

  2. 02
    Edge condition

    Burrs removed and cut faces inspected before the part leaves the station.

  3. 03
    Repeatable geometry

    Controlled shape so the panel locates without forced alignment.

Station outputA panel that locates cleanly, squares up and accepts the next stage without adjustment.

Aluminum slats and frame components prepared for assembly Station 02
Slat & frame preparation · in-line
FocusStraightness
ReleaseFrame set

Line noteStraightness is verified before the first bond line.

02Structure

Slat & Frame Preparation

Slats and frame components are laid out, checked and prepared as one assembly. Straightness and spacing are verified before adhesive or fasteners are applied.

Control points

  1. 01
    Straightness

    Slats checked for bow or twist before entering the frame fixture.

  2. 02
    Even spacing

    Slats located to the frame reference for a consistent rhythm across the cover.

  3. 03
    Contact faces

    Frame faces inspected for damage, burrs or anything that could disrupt the bond.

Station outputA frame that is straight, evenly loaded and ready for a clean bond line.

Industrial bonding and sealing of truck bed cover components Station 03
Bonding & sealing · in-line
FocusSeal path
ReleaseBond check

Line noteThe seal is inspected before the assembly is closed.

03Sealing

Bonding & Sealing

Adhesive and sealant are applied along the full joint, then checked before the assembly is closed. The result is a firm bond and a continuous seal that holds through weather and road use.

Control points

  1. 01
    Adhesive coverage

    Applied along the full mating path and checked before closure.

  2. 02
    Seal continuity

    Corners, ends and transitions inspected for gaps or voids.

  3. 03
    Clean finish

    Excess material controlled so visible surfaces stay clean.

Station outputA firm bond and a continuous seal — with no excess adhesive on visible faces.

Stamping and forming of metal components during truck bed cover production Station 04
Stamping & forming · in-line
FocusForm accuracy
ReleaseShape check

Line noteShape is set by the die, not by hand.

04Forming

Stamping & Forming

Metal parts are stamped and formed in dedicated dies, so each component takes its shape from the tool rather than by hand. Forming is controlled so the part holds its geometry through assembly.

Control points

  1. 01
    Die reference

    Each part is located against its die reference before pressing.

  2. 02
    Form accuracy

    Profile, radius and flatness checked against the drawing after forming.

  3. 03
    Edge & surface

    Stamped edges inspected for cracks, burrs and thinning before the part moves on.

Station outputA formed part that holds its shape and enters assembly without rework.

Final inspection of packed truck bed cover components Station 05
Final inspection · pack release
FocusCompleteness
ReleasePack release

Line noteRelease is a decision, not a final walk-around.

05Verification

Final Inspection

Before packing, the finished order passes a completeness, surface and protection check. Inspection is a release gate — not a final glance.

Control points

  1. 01
    Pack completeness

    Components and fittings checked against the build.

  2. 02
    Surface condition

    Visible faces checked for marks or handling damage.

  3. 03
    Protection layout

    Protective material and edge coverage verified before closure.

Station outputA complete, install-ready pack cleared for release.

Gloved handling and protective packaging of truck bed covers Station 06
Gloved packing · final release
FocusSurface care
ReleasePack integrity

Line noteThe last thing we touch is the first thing the customer sees.

06Packaging

Gloved Handling & Protective Packing

Finished parts are handled with gloves and packed with protection at the faces and edges. The last station is judged by how the cover arrives.

Control points

  1. 01
    Glove handling

    Finished surfaces handled only with gloves after inspection.

  2. 02
    Surface separation

    Contact faces separated and protected inside the pack.

  3. 03
    Shipping protection

    Edge and corner protection checked before the pack is sealed.

Station outputA clean cover, protected in transit and ready to install on arrival.

Release standard

Fit, seal and pack. All checked before release.

The line is judged by what leaves it. Every cover is held to the same release gate: dimensional confidence, a continuous seal and a pack that protects what it carries.

01 Dimensional fit Cut and formed against the fitment reference.
02 Seal integrity Bond and seal checked along the full joint.
03 Pack protection Surface and shipping protection verified.